For roads and highways: every hindrance on the corridor, on the clock

Highway work is lost to right of way, utility shifting and late drawings — and then to the notices nobody sent. BuildCore logs every hindrance against its contract's clocks, from NHAI EPC and HAM to CPWD and FIDIC, and keeps the evidence an extension of time needs.

BuildCore Hindrance and EOT dashboard: open hindrances, overdue notices, claims due, items awaiting the client; EOT days claimed, granted and pending; LD exposure; breakdowns by party, project and age; a deadline calendar and actions awaiting the user.
Hindrances on both sides' clocks, with the EOT position and LD exposure. Sample data.
Sound familiar?

Where these projects lose time and money

Right of way, handed over late

Every day of delayed land handover is an EOT — if it's notified in time.

Utilities in the way

Shifting that takes months needs a record that starts on day one.

Chainage-long quality

Inspections and NCRs spread over kilometres need to be traceable to location.

How BuildCore helps

What you'd use, and what it does

Hindrance & EOT

Hindrance & EOT

  • Preset clocks for NHAI EPC 2022, NHAI HAM and CPWD GCC 2023
  • A daily sweep of deadlines on both sides
  • Letters, client response by secure link and an evidence pack

More on Hindrance & EOT →

Construction PM

Progress

  • Daily progress reports by site
  • Constraints and workfronts along the corridor
  • P6 schedule import and look-ahead

More on Construction PM →

Quality (QC)

Quality

  • Pour cards, excavation and rebar checklists
  • NCRs with drawing and specification references
  • Punch lists before handover

More on Quality (QC) →

HSE & Safety

Safety

  • Permits for excavation, lifting and work at height
  • Journey management for fleet on live roads
  • Incidents investigated with 5-Why

More on HSE & Safety →

In practice

A hindrance, from the site to the EOT

1

Log

Right of way not handed over at a chainage.

2

Clock

The contract's notice deadline starts.

3

Notify

The letter goes out from a template.

4

Respond

The Authority responds through a secure link.

5

Evidence

Schedule impact and DPR idling attached.

6

Claim

The indexed evidence pack goes with the EOT.

Questions

Common questions

Yes. NHAI EPC 2022 and NHAI HAM are presets, alongside CPWD GCC 2023, Indian Railways GCC 2022, FIDIC and NEC4 — and every period can be edited.

Yes, through a secure link confirmed with a one-time code sent to their email.

The dashboard shows liquidated-damages exposure at risk, capped per regime where the contract value is set.

Other industries

BuildCore in other sectors

Modules on this page: Hindrance & EOT · Construction PM · Quality (QC) · HSE & Safety

See it on your project

A walkthrough shaped around your work

Tell us about your projects and we'll show you the parts of BuildCore that matter to you.