Isolations nobody removed
A permit closed with a lock still applied is how incidents start.
Substations, plants and pipelines put hot work, confined spaces and live isolations on the same site. BuildCore enforces the permit checks, tracks punch items through pre-commissioning, commissioning and PGTR, and keeps vendor documents and procurement on the project record.
A permit closed with a lock still applied is how incidents start.
Punch lists split between construction and commissioning lose items at the hand-off.
Test certificates and data sheets need the same control as drawings.
Hot work at the pipe rack.
Lines isolated; locks and tags recorded.
Gas test inside 30 minutes.
Only now can the permit be issued.
Isolation stays on record.
Every lock removed, then closed.
Hot work, cold work, confined space, work at height, excavation, electrical isolation (LOTO), lifting, line breaking and radiography, each with its own required checks.
Yes — construction, pre-commissioning, commissioning, PGTR and handover are stages on the same punch register.
Yes. Material inspections can be done pre-dispatch, and a rejection raises an NCR.