For energy and utilities: high-risk work under real control

Substations, plants and pipelines put hot work, confined spaces and live isolations on the same site. BuildCore enforces the permit checks, tracks punch items through pre-commissioning, commissioning and PGTR, and keeps vendor documents and procurement on the project record.

BuildCore HSE dashboard: TRIR, LTIFR, severity rate and days without a lost-time injury; man-hours, recordable incidents and corrective actions; open and expiring permits; a monthly trend and incidents by type.
HSE rates from man-hours, with permits and the monthly trend. Sample data.
Sound familiar?

Where these projects lose time and money

Isolations nobody removed

A permit closed with a lock still applied is how incidents start.

Commissioning on spreadsheets

Punch lists split between construction and commissioning lose items at the hand-off.

Vendor documents by email

Test certificates and data sheets need the same control as drawings.

How BuildCore helps

What you'd use, and what it does

HSE & Safety

Permit to work

  • Gas tests (O₂, LEL, H₂S, CO) within 30 minutes of issue
  • Lock and tag isolations that must be removed before close
  • Hot work, confined space, line breaking and radiography permits

More on HSE & Safety →

Quality (QC)

Commissioning

  • Punch items by stage — pre-commissioning, commissioning, PGTR, handover
  • Material inspections before dispatch
  • Hold and witness points on inspections

More on Quality (QC) →

Document Management

Vendor documents

  • Data sheets and certificates in the controlled register
  • Review workflows and C1–C4 responses
  • Sealed packages for handover

More on Document Management →

Procurement

Procurement

  • Prequalified vendors and sealed bids
  • Inspected goods receipt; rejections raise NCRs
  • Landed cost for imported equipment

More on Procurement →

In practice

A hot-work permit in a live plant

1

Raise

Hot work at the pipe rack.

2

Isolate

Lines isolated; locks and tags recorded.

3

Test

Gas test inside 30 minutes.

4

Issue

Only now can the permit be issued.

5

Work

Isolation stays on record.

6

Close

Every lock removed, then closed.

Questions

Common questions

Hot work, cold work, confined space, work at height, excavation, electrical isolation (LOTO), lifting, line breaking and radiography, each with its own required checks.

Yes — construction, pre-commissioning, commissioning, PGTR and handover are stages on the same punch register.

Yes. Material inspections can be done pre-dispatch, and a rejection raises an NCR.

Other industries

BuildCore in other sectors

Modules on this page: HSE & Safety · Quality (QC) · Document Management · Procurement

See it on your project

A walkthrough shaped around your work

Tell us about your projects and we'll show you the parts of BuildCore that matter to you.