For buildings and real estate: from the first drawing to a clean handover

Buildings are won on design and lost at handover. BuildCore controls drawings and submittals through the build, inspects finishes with checklists, verifies every punch item, and closes out with as-built packages and a checklist that reads the record itself.

BuildCore document management dashboard: documents in the register, pending approvals, disciplines and types; status tiles; recent documents with revision and status; and volume by discipline.
The drawing register by status and discipline. Sample data.
Sound familiar?

Where these projects lose time and money

Finishes snagged twice

Punch items closed without a check come back at the client walk-through.

Submittals by email

Material approvals scattered across inboxes can't be found when the question comes.

Handover that drags

As-builts and O&M documents collected at the end are the last thing to arrive.

How BuildCore helps

What you'd use, and what it does

Document Management

Drawings and submittals

  • Automatic revision codes and review workflows
  • Submittal decisions locked once final
  • Transmittals with acknowledgement tracking

More on Document Management →

Quality (QC)

Inspections and punch

  • Checklists for blockwork, plaster, waterproofing, tiling and more
  • Punch items verified before closing
  • Walkdowns that raise punch items as you go

More on Quality (QC) →

Project Close-Out

Handover

  • As-built packages verified line by line
  • A handover register by category and priority
  • Close-out that checks punch and NCRs live

More on Project Close-Out →

Commercial & Finance

Cost

  • Budget from committed to actual
  • Variation orders linked to their source
  • IPCs with retention and advance recovery

More on Commercial & Finance →

In practice

A floor, from finishes to handover

1

Inspect

Plaster and tiling checklists on site.

2

Snag

Walkdown raises punch items.

3

Fix

Assigned, fixed, sent back if not right.

4

Verify

Checked before closing.

5

Package

As-builts verified and handed over.

6

Close

The checklist reads the record.

Questions

Common questions

Walkdowns raise punch items as you go, with a printable report; each item is then verified before it closes.

Yes. Punch list, NCRs, retention bonds, as-builts and the contract are read live; anything waived is recorded with a reason.

Yes — shop drawings, product data and samples, with decisions locked once final.